The Project
- Supply contract for Técnicas Reunidas, for the development and construction of a containerized redundant solution (100% availability), for the reliable cooling of the turbines of a Combined Cycle power plant promoted by General Electric and Sumitomo in the Middle East (UAE).
- It involves two PEM electrolysers, 6 Nm3/h of ultra-pure 99.999% hydrogen production each.
- It also gets compression, providing the capability of directly switching between 20 and 165 barg.
- Extreme environmental operating conditions apply: 55 ºC, 95% humidity
Our customer
Técnicas Reunidas, S.A., (IBEXC: TRE) is a Spanish multinational company specialized in engineering and construction of infrastructures for the oil and gas sector. The company is listed on the Spanish Continuous Market and until June 2019 it was part of the IBEX 35.